Return Flow Under Control, JTT Terminates Contraflow Traffic Engineering KM 70 to KM 47 Toward Jakarta on the Jakarta–Cikampek Toll Road
25 Juni 2026

PRESS RELEASE
PT Jasamarga Transjawa Toll Road
No. 122/2026
Date March 25, 2026
Return Flow Under Control, JTT Terminates Contraflow Traffic Engineering KM 70 to KM 47 Toward Jakarta on the Jakarta–Cikampek Toll Road
Cikampek (25/03) – Following observed normal traffic conditions during the return flow period of the Idulfitri 1447H/2026 holiday, and based on Police discretion, PT Jasamarga Transjawa Toll (JTT) has terminated the contraflow traffic engineering from KM 70 to KM 47 toward Jakarta on the Jakarta–Cikampek Toll Road at 18:42 WIB.
JTT, together with the Police, continues to intensively monitor traffic conditions as vehicle volume toward Jakarta still shows an increase during the return flow period of Idulfitri 1447H/2026.
Currently, traffic conditions on the Jakarta–Cikampek Toll Road have returned to normal in both directions.
Vice President Corporate Secretary & Legal of PT Jasamarga Transjawa Toll, Ria Marlinda Paallo, stated, “JTT urges Trans Java toll road users to prioritize safety and prepare before entering the toll road. Ensure both driver and vehicle are in prime condition, ensure sufficient battery/power, fuel, and electronic money balance, and comply with traffic signs and officers’ directions on site,” said Ria.
Toll road users can also update travel information by downloading the Travoy application and contacting the 24-hour Jasa Marga One Call Center at 133 for the latest traffic information.
—————————————————-
For further information, please contact:
Ria Marlinda Paallo
VP Corporate Secretary and Legal
PT Jasamarga Transjawa Toll
Jl. Teuku Umar, Sepanjang Jaya, Rawalumbu Bekasi - 17114
Email: jasamarga.transjawa@jasamarga.co.id
Instagram: @official.jmtransjawatol


