Jakarta–Cikampek Toll Road Maintenance, JTT Ensures Services Remain Optimal
11 Juli 2026

PRESS RELEASE
PT Jasamarga Transjawa Tol
No. 222/2026
Date: 11 July 2026
Jakarta–Cikampek Toll Road Maintenance, JTT Ensures Services Remain Optimal
Cikampek (11/07) – PT Jasamarga Transjawa Tol (JTT) is once again carrying out routine maintenance works on the Jakarta–Cikampek Toll Road as part of its commitment to ensuring optimal services for road users. The maintenance is undertaken to preserve road quality and condition while supporting safe, comfortable, and smooth journeys.
Senior Manager Representative Office 1 of PT Jasamarga Transjawa Tol, Jauzy Anbiya, stated that JTT continuously conducts road maintenance works to maintain the reliability of the Jakarta–Cikampek Toll Road.
“As one of the country's main mobility and logistics corridors, the Jakarta–Cikampek Toll Road requires routine maintenance to maintain service standards and road user safety. JTT continues to carry out the works effectively while ensuring traffic flow around the work areas remains as smooth as possible,” explained Jauzy.
The pavement reconstruction works will be carried out at several locations on the Jakarta–Cikampek Toll Road, including:
-
Cikunir On Ramp towards Cikampek, Lane 2, from Friday (10/07) at 09.00 PM WIB until Monday (13/07) at 06.00 AM WIB
-
Cikarang Barat On Ramp towards Cikampek, Lane 1, from Friday (29/06) at 10.00 PM WIB until Tuesday (14/07) at 10.00 AM WIB
-
KM 20+150 to KM 20+285 towards Cikampek, Lane 1; KM 36+835 to KM 36+950 and KM 36+835 to KM 36+900, Lane 1 and outer shoulder, from Saturday (11/07) at 09.00 AM WIB until Friday (17/07) at 10.00 AM WIB
-
KM 37+805 to KM 37+735 towards Jakarta, inner Lane 1, from Monday (13/07) at 09.00 AM WIB until Thursday (16/07) at 11.00 AM WIB
-
KM 72+247 to KM 72+147 towards Jakarta, Lane 3 and inner shoulder, from Monday (13/07) at 09.00 AM WIB until Friday (17/07) at 08.00 AM WIB
-
KM 27+060 to KM 26+838 towards Jakarta, inner Lane 2, from Monday (13/07) at 09.00 AM WIB until Friday (17/07) at 10.00 AM WIB
-
KM 56+150 to KM 56+055 towards Jakarta, inner Lane 1, from Monday (13/07) at 09.00 AM WIB until Friday (17/07) at 04.00 PM WIB
Acting Vice President Corporate Secretary & Legal of PT JTT, Dary Achmad Budi, stated, “Throughout the maintenance period, JTT continues to prioritize smooth traffic flow by implementing situational traffic management and ensuring that all work areas are equipped with safety facilities in accordance with operational standards. Information regarding the maintenance works is also disseminated through Dynamic Message Signs (DMS), Jasa Marga Group’s official social media channels, and information banners installed around the work locations,” said Dary.
Dary added, “We apologize for any inconvenience that road users may experience during the maintenance period. We also express our appreciation and gratitude to all road users for their patience and cooperation throughout the implementation of these maintenance works. Road users are advised to plan their journeys in advance, ensure that both their vehicles and drivers are in good condition, maintain a safe following distance, and comply with traffic signs as well as the instructions of officers on site,” concluded Dary.
The latest traffic information on Jasa Marga toll roads can be accessed through the Jasa Marga 24-hour One Call Center at 133 and the Travoy application.
——————————————
For further information:
-
Jauzy Anbiya
Senior Manager Representative Office 1
PT Jasamarga Transjawa Tol
Plaza Tol Jakarta-Cikampek
Jl. Teuku Umar, Sepanjang Jaya, Rawalumbu, Bekasi – 17114 -
Dary Achmad Budi
Acting VP Corporate Secretary & Legal
PT Jasamarga Transjawa Tol
Jl. Teuku Umar, Sepanjang Jaya, Rawa Lumbu, Bekasi – 17114
Email: jasamarga.transjawa@jasamarga.co.id
Instagram: @official.jmtransjawa


