Supporting Road User Comfort, JTT Conducts Maintenance on the Semarang A, B, C Toll Road
17 September 2026

PRESS RELEASE
PT Jasamarga Transjawa Tol
No. 259/2026
Date: September 17, 2026
Supporting Road User Comfort, JTT Conducts Maintenance on the Semarang A, B, C Toll Road
Semarang (17/09) – PT Jasamarga Transjawa Tol (JTT) is once again carrying out maintenance work on the Semarang A, B, C Toll Road, including Expansion Joint Finger and rigid pavement reconstruction works. The work is part of efforts to maintain Minimum Service Standards (SPM), infrastructure reliability, as well as road user safety and comfort.
The work is being carried out in stages with traffic management around the work locations. The schedule is as follows:
Expansion Joint Finger Works
-
KM 423+541 Section A towards Jatingaleh, Lane 2 and Lane 1, from Thursday, September 17, 2026 at 18:00 WIB to Friday, September 18, 2026 at 06:00 WIB.
Rigid Reconstruction Works
-
KM 420+965 to KM 421+050 Section A towards Jatingaleh, Lane 1 and Outer Shoulder, from Monday, September 14, 2026 at 09:00 WIB to Sunday, September 27, 2026 at 09:00 WIB.
-
KM 428+325 to KM 428+219 Section A towards Jakarta, Outer Shoulder, from Monday, September 14, 2026 at 09:00 WIB to Sunday, September 27, 2026 at 09:00 WIB.
-
KM 428+087 to KM 427+974 Section A towards Jakarta, Outer Shoulder, from Thursday, September 17, 2026 at 09:00 WIB to Wednesday, September 30, 2026 at 09:00 WIB.
Senior Manager of Representative Office 2 Semarang A, B, C of PT Jasamarga Transjawa Tol, Ginanjar Bekti Rakhmanto, stated that maintenance work is carried out regularly to ensure that the condition of toll road infrastructure remains well maintained and can support smooth journeys for road users.
“The Expansion Joint Finger and rigid pavement reconstruction works are part of the maintenance program to maintain the quality and reliability of toll road infrastructure. During the work, the toll road will remain operational, with situational traffic management implemented around the work locations to maintain road user safety and smooth traffic flow,” explained Ginanjar.
Acting VP of Corporate Secretary and Legal of JTT, Dary Achmad Budi, stated that JTT has prepared operational mitigation measures, including the installation of work safety signs in accordance with standards, deployment of personnel in the field, and coordination with the Police to support smooth traffic flow during the work.
Dary also apologized for any potential inconvenience that road users may experience during the work.
“We apologize for any potential inconvenience or traffic slowdowns during the work. JTT is making every effort to ensure that the work is carried out as planned while prioritizing safety. We appreciate the attention and cooperation of road users in remaining cautious when passing through the work area,” said Dary.
JTT urges road users to anticipate their travel time, ensure that both their vehicles and drivers are in good condition, maintain sufficient electronic toll card balances, and comply with traffic signs and instructions from officers in the field.
The latest traffic information is available through the Travoy application or Jasa Marga Group One Call Center at 133.
—————————————————
For further information, please contact:
-
Ginanjar Bekti Rakhmanto
Senior Manager
Representative Office 2 Semarang ABC
PT Jasamarga Transjawa Tol
Manyaran Toll Plaza – Semarang, Central Java 5014 -
Dary Achmad Budi
Acting VP of Corporate Secretary and Legal
PT Jasamarga Transjawa Tol
Jl. Teuku Umar, Sepanjang Jaya, Rawa Lumbu, Bekasi – 17114
Email: jasamarga.transjawa@jasamarga.co.id
Instagram: @official.jmtransjawa



